Detail of turbine blades stored in the yard prior to installation in the North Sea wind farm, from the north-east

Date:
29 Aug 2024
Location:
General Electric Renewable Energy, Installation Yard for Dogger Bank A, B and C Wind Farm, Tees Road, Able Seaton Port, Hartlepool
Reference:
DP439071
Type:
Photograph (Digital)
Explore our collections: Search over 1.5 million records

Content

This is part of the Job: 2K/32563 Installation Yard for Dogger Bank A, B and C Wind Farm, General Electric Renewable Energy, Able Seaton Port, Tees Road, Hartlepool, County Durham; within the Volume: VF000475 Climate Change; within the Series: HEC01/123 Climate Change; within the Collection: HEC01 Historic England

Rights

© Historic England Archive

People & Organisations

Photographer: Davies, James O: Historic England

Keywords

Port, Dock, Wind Turbine