General view of the yard from the east, with turbine base sections stored in the foreground and the Brent Charlie oil rig in the distance, during its decommissioning
- Date:
- 29 Aug 2024
- Location:
- General Electric Renewable Energy, Installation Yard for Dogger Bank A, B and C Wind Farm, Tees Road, Able Seaton Port, Hartlepool
- Reference:
- DP439062
- Type:
- Photograph (Digital)